Factory Acceptance Test

Before shipment, ZONESUN conducted a factory acceptance test of a customized ZS-FAL180YT production line using the customer's packaging materials. The project was configured for 100 ml dropper bottles with a target production speed of 60 bottles per minute.

100 ml Filling Volume 60 Bottles/Min Target Customer-Supplied Samples Pre-Shipment Testing
The assembled ZS-FAL180YT dropper bottle production line prepared for factory acceptance testing.
The assembled ZS-FAL180YT dropper bottle production line prepared for factory acceptance testing.

Test overview: The inspection covered the complete packaging process, including liquid filling, automatic dropper feeding, dropper positioning, cap feeding, cap tightening and bottle labeling. Filling accuracy, operating speed, assembly quality, labeling accuracy, continuous-running stability and machine safety were checked before shipment.

ZS-FAL180YT Machine model
100 ml Test filling volume
60 BPM Target line speed
5 Stages Integrated process

1. Customer Packaging Requirements

The customer required an automated line capable of handling 100 ml dropper bottles while maintaining stable bottle transfer and consistent packaging quality at a target speed of 60 bottles per minute.

The machine configuration was selected according to the customer's bottle, dropper, screw cap and self-adhesive label. The complete workflow included filling, dropper feeding, dropper positioning and pressing, cap tightening, and automatic labeling.

01 Bottle filling
02 Dropper feeding
03 Dropper positioning
04 Cap tightening
05 Bottle labeling

2. Test Preparation with Customer Samples

Using the customer's actual packaging components is an important part of pre-shipment testing. Differences in bottle diameter, bottle height, neck dimensions, dropper structure, cap thread and label material can affect machine settings and final packaging quality.

Before starting the formal test, our engineers checked the supplied bottles, droppers, caps and labels. The guide rails, positioning parts, vibrating feeding bowls, filling parameters, capping mechanism and labeling sensors were then adjusted to match these samples.

Customer-supplied bottles, droppers, caps and labels used during testing.
Customer-supplied bottles, droppers, caps and labels used during testing.
Machine parameters and positioning components were adjusted for the customer's packaging materials.
Machine parameters and positioning components were adjusted for the customer's packaging materials.

3. Factory Acceptance Test Items

Filling Accuracy and Dosing Stability

Multiple filled bottles were sampled during the test to check whether the filling volume remained consistent at the specified 100 ml setting. The inspection also checked for dripping, splashing, foaming and contamination around the bottle opening.

Operating Speed

The production line was tested under continuous operating conditions with a target output of 60 bottles per minute. Engineers observed whether bottle feeding, filling, dropper placement, capping and labeling remained synchronized as the operating speed increased.

Dropper Feeding and Positioning

The dropper feeding system was inspected for orientation consistency and stable transfer. Each dropper needed to enter the bottle opening correctly and remain properly positioned before pressing and capping.

Capping Stability and Sealing Quality

Finished bottles were checked for correctly fitted droppers, aligned caps and consistent tightening. The test also looked for loose caps, tilted caps, damaged threads and surface damage caused by excessive tightening force.

Labeling Accuracy

Label position, adhesion and application quality were inspected on completed bottles. Our engineers checked for visible skewing, wrinkles, bubbles and inconsistent starting or ending positions.

Continuous Operation and Safety Inspection

The machine was operated continuously to identify possible bottle jams, missed components, unstable sensors or interruptions between workstations. Emergency stops, protective components, electrical connections and moving mechanisms were also checked before shipment.

Factory test video showing filling, dropper placement, capping and labeling under continuous operating conditions.
Close-up inspection of dropper positioning and cap tightening.
Close-up inspection of dropper positioning and cap tightening.
Finished 100 ml bottles inspected for closure and labeling quality.
Finished 100 ml bottles inspected for closure and labeling quality.
  • Filling-volume consistency and nozzle performance
  • Production output under continuous operating conditions
  • Stable dropper feeding, positioning and pressing
  • Cap alignment, tightening consistency and sealing quality
  • Label position, adhesion and finished appearance
  • Sensor response, emergency stops and operational safety

4. Test Results

After fine-tuning the operating parameters, the production line was tested with the customer's 100 ml bottle samples. The results were recorded and reviewed against the agreed project requirements. The table below summarizes the results included in this article. Quantitative filling and labeling tolerances, measured production output, and continuous test duration are not listed here.

Test Item Customer Requirement Recorded Result Status
Filling volume 100 ml 100 ml Passed
Dropper placement Correct feeding and stable positioning Droppers were correctly fed, positioned and pressed Passed
Capping quality Aligned caps with stable tightening No loose, visibly tilted or damaged caps were observed Passed
Safety inspection Controls and safety functions operating correctly Emergency stops, sensors and operating controls were checked Passed
Note: The final operating speed and accuracy of a packaging line can vary according to the liquid characteristics, bottle dimensions, dropper and cap consistency, label material, and the configuration selected for a specific project.

5. Customer Confirmation Before Shipment

After the test was completed, photos and operating videos were prepared for the customer's review. This allowed the customer to verify the complete packaging process and finished-bottle quality before shipment.

Following approval, the machine was cleaned and inspected again. Adjustable parts were secured, vulnerable components were protected, and the equipment was packed in export-standard wooden cases with internal reinforcement to reduce movement during transportation.

The equipment was cleaned and inspected after customer confirmation.
The equipment was cleaned and inspected after customer confirmation.
Protective wrapping and reinforced wooden-case packing prepared for shipment.
Protective wrapping and reinforced wooden-case packing prepared for shipment.

Why Pre-Shipment Testing Matters

A successful packaging line depends on more than the individual machines. Bottles, droppers, caps, labels, sensors and transfer mechanisms must work together as one synchronized system. Testing with the customer's actual packaging materials helps identify compatibility issues before the machine leaves the factory.

For customized projects, ZONESUN can evaluate bottle samples and production requirements before proposing a machine configuration. Testing videos and finished samples can also be provided for customer confirmation before shipment.

Need a Dropper Bottle Packaging Line?

Send us your bottle, dropper, cap and label specifications, required filling volume, liquid characteristics and target production speed. Our team can recommend or customize a suitable filling, capping and labeling solution.

View the ZS-FAL180YT Production Line